Zona Hotelera, Cancún

Zona Hotelera, Cancún

Portfolio item page

Project Details

  • Designer: Zona Hotelera, Cancún
  • Project manager: Grupo Insolar
  • Coder: Grupo Insolar
  • Art director: Grupo Insolar
  • Date: 6 May, 2020
  • Tags: Portafolio

System Install: Interconected system to CFE of 12.5 kWp.
Date: 2019 September
Description: Interconnected system to CFE with 12.15 kwp installed, has an estimated daily production of 51 kWh with savings of $ 15,300 bimonthly pesos.

Back to Top