- Designer: Residencial Cumbres, Cancún
- Project manager: Grupo Insolar
- Coder: Grupo Insolar
- Art director: Grupo Insolar
- Date: 6 May, 2020
- Tags: Portafolio
System Install: Grid Tie System to CFE of 8.9 kWp
Date: October 2019
Description: System interconnected to CFE with 16 kwp kWp installed, has an estimated daily production of 67.2 kWh with savings of $ 20,000 bimonthly pesos